RFT for Nurses Memorial Chapel Earthquake Repair and Strengthening

Details

Tender Closed
RFx ID : 18674494
Tender Name : RFT for Nurses Memorial Chapel Earthquake Repair and Strengthening
Reference # : Restricted Tender
Open Date : Thursday, 6 July 2017 2:30 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 4 August 2017 12:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
Regions: N/A
Exemption Reason : None
Required Pre-qualifications : None
Contact : Anna Preston
anna.preston@ccc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

The purpose of this RFT is to invite Tenderers to submit their Tenders for construction services as the main contractor for the repair and strengthening of the Nurses Memorial Chapel Riccarton Avenue.

The Contract Works for this RFT shall include, but are not limited to:
§ Prestart meeting with Heritage Team and Consultants.
§ Site establishment and installation of the temporary protection to the heritage fabric throughout the building.
§ Careful removal of all stain glass windows and transport the windows off site for cleaning and storage during the repair and strengthening works.
§ Installation of 200mm reinforced concrete overlay slab to the basement area.
§ Installation of a 200 series masonry block walls to the basement to support the existing ground floor slab and foundation walls.
§ Sections of the existing interior timber panelling will be deconstructed and stored on site for reinstallation. Part of the inner brick walls will then be removed and replaced with new reinforced masonry block.
§ The existing parquet flooring will be carefully removed and stored on site for re-installation. The ground floor slab will then be checked for cracks and repairs completed where necessary.
§ The existing brick buttresses will be partly deconstructed from the inside and a concrete core will be added to connect with the inner blockwork walls and new ring beam.
§ The two gable ends, Sanctuary arch will be deconstructed and new reinforced concrete walls will be built which will then be clad with the existing cut down limestone and existing brick to the outer skin.
§ A new reinforced ring beam will be constructed between the top wall of the building and the roof structure. This will link the walls with the newly formed gable ends.
§ A portion of the ground floor slab will be removed and replaced with a new slab.
§ The slate tiles to the roof will be will be carefully removed, stored on site and a new plywood diaphragm will be installed before the tile are relayed.
§ The installation of a new fire protection sprinkler system, upgrade of the heating system and emergency lighting will be completed.
§ All the internal timber panelling, parquet flooring, limestone and associated interior fittings will then be re-instated.
§ Plastering, painting and decoration of the chapel where required will be completed.
§ Finishing to the parquet flooring applied.
§ Re-installation of the stain glass windows.
§ Site works

RFx Outcome

No Winner