Advance Notice – Lead Contractor (for the installation of a new internal lift)

Details

RFx ID : 33251482
Tender Name : Advance Notice – Lead Contractor (for the installation of a new internal lift)
Reference # : 2026-01
Open Date : Tuesday, 23 December 2025 1:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 16 January 2026 1:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Scion Facilities
Tender Type : Notice of Information (Advance Notice) (NOI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Bay of Plenty
Required Pre-qualifications : None
Contact : Carroll Warbrick
0223534531
Overview

New Zealand Institute for Bioeconomy Science Limited trading as Bioeconomy Science Institute (BSI) Scion Group is providing advance for a Lead Contractor for the installation of a new internal lift including removal and make-good of the existing lift and lift shaft.

This Advance Notice is issued to give the construction market early visibility and time to prepare for the tender process.

Project Overview
The project will involve construction works including:
• Removal of the existing lift and associated components, including make-good to the existing lift shaft
• Enabling works to support installation of a client-procured lift spanning three levels
• Penetration through a concrete floor slab between basement and ground floor
• Delivery of works within an occupied building environment, including access management, noise/dust control, and site safety controls
• Coordination of multiple trades and interfaces, including electrical, fire services (including sprinklers if applicable), data, and building services
• Compliance with all relevant building, health and safety, and quality requirements

Scope of the Lead Contractor Role
The Lead Contractor will be responsible for:
• Overall construction management and site coordination
• Managing the programme, sequencing, and subcontractor activities
• Health & Safety leadership and compliance management
• Quality assurance and construction monitoring
• Cost control, reporting, and management of construction activities
• Working collaboratively with the client, consultants, and stakeholders
• Delivery of works to specification, budget, and agreed timeframes

Indicative Procurement Timeline
• Advance Notice published: 23 December 2025
• Supplier Briefing: end of January 2026
• RFP / Tender release: early February 2026
• Tender closing: early March 2026
• Contract award: mid March 2026
• Construction commencement: April 2026

Supplier Requirements (Indicative)
Respondents will likely be required to demonstrate:
• Relevant experience as a lead contractor on similar building and/or live environment projects
• Strong health and safety performance, supported by recognised prequalification (SiteWise, Totika, or equivalent)
• Capacity and capability to deliver within the required timeframe
• Robust quality management systems
• Financial capacity appropriate to the scale and risk profile of the works

Further Information
All inquiries and information will be made available via GETS once the supplier briefing is released.