You are not logged in.

CON001079 Smith Road Bridge Replacement

Details

RFx ID : 29191735
Tender Name : CON001079 Smith Road Bridge Replacement
Reference # : CON001079
Open Date : Thursday, 11 April 2024 8:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 13 May 2024 4:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : BOPRC Procurement
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72140000 - Heavy construction services
  • 72150000 - Specialized trade construction and maintenance services
  • 78180000 - Transportation repair or maintenance services
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Bay of Plenty
Exemption Reason : None
Required Pre-qualifications : None
Contact : Amber R
procurement@boprc.govt.nz
0800 884 880
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The Bay of Plenty Regional Council are seeking a suitably qualified civil construction contractor to carry out the replacement of 2 culverts on Smith Road with a single span bridge constructed with 2 concrete ‘T’ beams.

The works are located 585m from the start of the road at the intersection with Thornton Road.

Briefly, the physical works include:

• Site establishment (including required worksite areas and onsite offices);
• Construction, maintenance, and removal of temporary access road:
• Deconstruction and removal of existing culverts:
• Supply and placement of rock rip rap to the new canal cut margin:
• Construction of new bridge including monitoring and testing during construction:
• Construction of new road, including monitoring and testing during construction:
• Installation and maintenance of sediment and erosion control measures during the works
• Installation and maintenance of sediment and erosion control measures during the works;
• Traffic management along Smith Road
• Reinstatement of affected areas on completion of works:
• Staging plan detailing how the works will be managed to achieve the design while maintaining flood protection, channel flow and access to adjoining properties during the works.