2020 0164 Rangitaiki River East Bank Road Floodwall Reconstruction

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 24002946
Tender Name : 2020 0164 Rangitaiki River East Bank Road Floodwall Reconstruction
Reference # : 2020 0164
Open Date : Monday, 22 February 2021 1:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 17 March 2021 3:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : BOPRC Procurement
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
Regions:
  • Bay of Plenty
Exemption Reason : None
Required Pre-qualifications : None
Contact : Debbie Tate
procurement@boprc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

Briefly, the works include:
• A contractor’s methodology that will ensure construction of the works is such that they are able to reinstate the level of flood protection to match the level of existing flood protection should the 3 day forward weather forecast predict the risk of flooding;
• Protection and maintenance of access and servicing for existing residential properties;
• Topsoil stripping and stockpiling;
• Excavation and removal of sections of existing stopbank;
• Removal of the existing stormwater pipe and structure;
• Carefully de-construct the concrete flood wall and any other buried hard engineered structures and dispose off-site
• Trim the stopbank ends in preparation to tie in the new stopbank;
• Construction of new stopbank on the proposed alignment;
• Construction of new sheet pile wall as part of new stopbank works;
• Rock riprap work beside the river where disturbed by the Works;
• Road widening including new kerb and channel;
• New PE stormwater pipe to river including penetration through the sheet pile wall, wingwall, flap gate and scour works;
• New stormwater pipes, catch pits and wingwalls;
• Reshaping of the existing swales;
• Top soiling and grassing of site;
• Reinstatement of all affected surfaces;
• Clearing and tidying of the total site;
• Preparation and submission of as-built drawings;
• Associated project management and site supervision traffic management, erosion and sediment control including de-watering, survey setout;
• Other miscellaneous items described or implied in the specifications or drawings.

RFx Outcome

No Winner