Tender Closed
|
|
RFx ID : | 27821480 |
Tender Name : | 746-23-427-AC - Wiri EMU Depot - Stabling Yard Extension |
Reference # : | 746-23-427-AC |
Open Date : | Thursday, 3 August 2023 1:00 PM (Pacific/Auckland UTC+12:00) |
Close Date : | Monday, 4 September 2023 10:00 AM (Pacific/Auckland UTC+12:00) |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
Roberto Chavez Procurement@at.govt.nz |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : |
This procurement seeks to select a Lead/Head Contractor to deliver the Physical Works package through to the commissioning of the facility and hand it over to the Operator.
The project will require the integration of several specialized elements and will therefore suit a highly skilled Main Contractor with robust project management processes, experience in the integration of works of this nature, and a competent and capable workforce to successfully complete the Physical Works Construction package.
The Physical Works Construction package will include but is not limited to the following:
• Project management of all aspects of the Physical Works, including the commissioning of the completed facility;
• Earthworks, drainage, wastewater and utility services installation or ducting as required,
• Retaining wall construction;
• Foundation works for access stairs, light columns, and OLE mast;
• Roading and footpath construction, including a rail level crossing and associated safety systems or elements;
• Management of Installation of rail signals and control infrastructure being provided and installed by nominated Contractors,
• Installation of supplied rail infrastructure elements, including sleepers, track, and turnouts;
• Supply and installation of rail infrastructure elements incl., ballast, rail clips, pads, and stairs;
• Connection to existing mainline rail infrastructure and the existing EMU maintenance facility network, including allowance for restricted access periods and ‘block of line’ work;
• Supply and installation of OLE equipment, including commissioning;
• Liaison with the management of and close cooperation with material suppliers and other nominated specialist contractors to achieve the overall project outcomes; and,
• Liaison and engagement with various stakeholders throughout the construction phase.