You are not logged in.

746-23-511-PS - Matiatia Wharf Northern Berth Design

Details

Tender Closed
RFx ID : 27146993
Tender Name : 746-23-511-PS - Matiatia Wharf Northern Berth Design
Reference # : 746-23-511-PS
Open Date : Monday, 27 March 2023 11:30 AM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 18 April 2023 10:00 AM (Pacific/Auckland UTC+12:00)
Tender Type : Registration of Interest (ROI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72101500 - Building maintenance and repair services
  • 72102900 - Facility maintenance and repair services
  • 72103300 - Infrastructure maintenance and repair services
Regions:
  • Auckland
Required Pre-qualifications : None
Contact : Roberto Chavez
procurement@at.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

This ROI seeks to procure a suitable marine designer, supported by a naval architect, to progress the preliminary design for Pier 2 - Northern Berth Pontoon and Gangway Renewal Design.

Matiatia Main Wharf is the primary port for visitors arriving and departing from Waiheke and is the second busiest terminal in Auckland’s Ferry Network, after Downtown, with services running every 30 minutes.

The wharf was originally constructed in 1993 and consists of a reinforced concrete deck supported by concrete main piles. The original substructure comprised four concrete pontoons that were bound together as one large unit, supporting two gangways (lower / upper) for Pier 1 (southern side), and a single gangway on Pier 2 (northern side). The pontoon structure supporting Piers 1 and 2, had a design life of 15 years and prior to decommissioning, was 19 years old.

Auckland Transport is in the process of renewing/replacing the berthing infrastructure (pontoons, gangways and walkways) at both piers 1 and 2. The new Pier 1 infrastructure opened for passenger service in December 2022 and is in the process of closing out construction activities. The focus of the wharf renewal now shifts towards the design of Pier 2, the northern berth.

The recently completed renewal works for Pier 1, decommissioned the original pontoon and installed a smaller steel pontoon serving just Pier 1. In the future Pier 2 will have its own separate steel pontoon, allowing the berthing structures to work independently of each other. This has a flow-on benefit for maintenance activities which can take one pontoon out of operation if required, while the other stays in service.

In conjunction with the Pier 1 upgrade, AT also instructed designers Worley Consultants, to develop a preliminary design to replace the Pier 2 pontoons and gangways. They have subsequently completed a 3D (Revit) model, Basis of Design and Principal’s Requirements. The project is now at a stage where it is ready to progress into the next design stage for Pier 2.

RFx Outcome

This tender has been completed.

Further information:
Two suppliers were shortlisted and invited to participate in the second stage - RFT.

Date RFx was completed/updated: Wednesday, 21 June 2023 5:28 PM (Pacific/Auckland UTC+12:00)