Tender Closed
|
|
| RFx ID : | 26034594 |
| Tender Name : | 746-22-884-PS - Wellesley Street Bus Improvements Stage One - Early Contractor Involvement |
| Reference # : |
746-22-884-PS
|
| Open Date : | Monday, 11 July 2022 4:00 PM (Pacific/Auckland UTC+12:00) |
| Close Date : | Friday, 5 August 2022 10:00 AM (Pacific/Auckland UTC+12:00) |
| Tender Type : | Request for Proposals (RFP) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
Roberto Chavez physicalworks@at.govt.nz |
| Alternate Physical Delivery Address : | |
| Alternate Physical Fax Number : | |
| Agency Address : | |
| Related Tenders: | |
This procurement relates to engagement of a Contractor to provide ECI services during the delivery of Detailed Design for Stage One of Wellesley Street Bus Improvement (WSBI) project.
The WSBI project is proposed by AT to develop Wellesley Street into the midtown bus movement corridor, between Victoria Street and Symonds Street. The project responds to the bus operational requirements of the Bus Reference Case 2020 and the City Centre Bus Plan, which will see 2-way bus operations for both North Shore and Isthmus services consolidated on Wellesley Street. Bus stops for both service groups as well as Outer Link services are proposed to be clustered at key locations.
WSBI Stage One, between Albert St and Queen St, needs to be built prior to the new City Rail Link (CRL) project becoming operational in late 2024. The new Te Wai Horotiu (Aotea) Station, anticipated to become New Zealand’s busiest train station, is located on this part of Wellesley Street.
The preferred design for Stage One was advanced to a preliminary design level during 2021 with external stakeholder engagement and public consultation completed early 2022. A Resource Consent application for Stage One was lodged in March 2022.
This design phase follows the completion of the preliminary design of Stage One works by Jacobs on behalf Auckland Transport (AT).
A Contractor is now required to input into construction planning and the detailed design and preparation of supplementary documentation so that construction phase can be successfully implemented. Construction is planned to commence in mid-2023 and needs to be completed before CRL works are completed and Te Wai Horotiu (Aotea) Station is opened.
Detailed Design of Stage One is planned to commence in mid-June 2022 with design completion milestones as follows:
- Complete Detailed Design package delivered by mid-November 2022
- Complete Issued for Construction package delivered by mid-February 2023.
This tender has been awarded.