402-20-012-PW1 - Matakana Link Road Stage 1 Construction

Details

Tender Closed
RFx ID : 21569641
Tender Name : 402-20-012-PW1 - Matakana Link Road Stage 1 Construction
Reference # : 402-20-012-PW1 Restricted Tender
Open Date : Wednesday, 11 September 2019 4:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 4 November 2019 10:00 AM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
Regions:
  • Auckland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Roberto Chavez
physicalworks@at.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

Introduction
The Matakana Link Road (MLR) project is a new 1.35km greenfield road proposed between State Highway 1 (SH1) and Matakana Road in Warkworth.
Warkworth has been identified as a Satellite Town with over 1000ha of future urban zoned land. Over the next 30 years these future urban areas are expected to accommodate approximately 7,500 additional dwellings, or an additional 20,000 people.
The MLR project will improve resilience of the transport network by providing an alternative route to the busy Hill Street intersection, and also facilitate planned growth in the Warkworth area as identified by Auckland Council’s Warkworth Structure Plan and the Supporting Growth Alliance transport network.
The project will form one piece of the overall future transport network for Warkworth. In particular, it will connect to the New Zealand Transport Agency’s (NZTA) Puhoi to Warkworth (P2Wk) project, and the future Western Link and Sandspit Link Roads.

Staging
The MLR project is proposed to be delivered in two stages. This has been proposed to address affordability issues and align with updated land use modelling which suggests that four lanes may not be required until after 2036.

Scope
This RFT seeks to complete the construction of Stage 1 of the MLR project while meeting all consent, designation, and land purchase conditions.
In general this will include, but is not limited to,:
• A new road with up to four lanes of capacity;
• Walking and cycling facilities on one side of the road;
• A new 90m long bridge crossing with up to four lane of capacity and cultural art elements;
• A new roundabout intersection with Matakana Road;
• Stabilisation of a known landslide;
• Tie ins with NZTA’s Matakana Link Road stub, which forms part of the P2Wk works including a signalised intersection of SH1/MLR;
• Provisions for Power, Gas, Telecommunications and Water within the road corridor;
• Relocation of existing services and utilities identified on Matakana Road;
• Installation of new street lighting;
• Landscaping, urban design and mitigation planting;
• Stormwater wetlands and raingardens

Stage 1 Options
Following the decision to stage the project, political and public feedback resulted in a direction to maximise the potential infrastructure provided in Stage 1 which would minimise the future Stage 2 costs and alleviate public concerns that a two lane capacity road in Stage 1 would be insufficient as growth would occur much faster than predicted.
In addition to this, disc

RFx Outcome

This tender has been awarded.

  • Wharehine - NEW ZEALAND
    Value $ 26,060,353

Award Date: Thursday, 2 July 2020 (Pacific/Auckland UTC+12:00)
Date RFx was completed/updated: Thursday, 2 July 2020 4:30 AM (Pacific/Auckland UTC+12:00)