Tender Closed
|
|
RFx ID : | 21027142 |
Tender Name : | 369-19-117-PW2 Dominion Road – Mt Roskill Village Streetscape Upgrade |
Reference # : | 369-19-117-PW2 |
Open Date : | Monday, 13 May 2019 1:30 PM (Pacific/Auckland UTC+12:00) |
Close Date : | Monday, 10 June 2019 12:00 PM (Pacific/Auckland UTC+12:00) |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : | |
Regions: | N/A |
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
Michelle Ferguson Michelle.ferguson@govt.nz 447 4759 |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : | |
Agency Address : |
This Request for Tender (RFT) is an invitation to Panel Two members of the Physical Works Panels, to submit a tender for the Double Decker Bus Route: Dominion Road – Mt Roskill Village Streetscape Upgrade Contract. This upgrade project was initiated and is funded by the Puketāpapa Local Board as part of the overall plan to rejuvenate the Mt Roskill village. Auckland Transport is a project partner that is responsible for delivery this upgrade project as part of the Double Decker Bus Project on Dominion Road.
The extent of the works is mainly the areas in the village that had been affected by the double decker bus enabling works, where the footpath had been widened and the kerb line had been modified to provide lateral clearance for the double decker bus operations. These enabling works are completed and double decker buses are now operational on Dominion Road.
The physical works under this contract includes works to lay the natural stone paving across the footpath with the concrete work associated, apply resin surfacing across the road carriageway and footpath, apply paint and resin surfacing to the laneway and install nature rock seats with the associated foundation works.
Two construction options for laying the natural stone paving are included in this RFT.
Option 1 – Precast panels
Option 2 – Cast in-situ
The upgrade project is expected to have a contract period of 5 months and the physical works on site may vary dependent on the construction option chosen. It is anticipated the precast panels option will require less construction time on site. However, this option will require a longer lead in time for manufacturing the precast panels and more precise construction planning.
This tender has been awarded.