You are not logged in.

Matai Bay Road Bridge C03 and Hihi Road Bridge F07 Repairs

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 26765155
Tender Name : Matai Bay Road Bridge C03 and Hihi Road Bridge F07 Repairs
Reference # : 7/21/207
Open Date : Tuesday, 20 December 2022 3:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 1 February 2023 3:30 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Raelene Rankin
+6494015410
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

Tenders are invited for the above contract, located at:
• Bridge C03 on Matai Bay Road (RP 3.940), Karikari Peninsula, 250 metres north of the intersection of Matai Bay Road and Wairahoraho Road (Coordinates, -34.84031, 173.39840).
• Bridge F07 on Hihi Road (RP 2.365), Mangonui Harbour, 520 metres southeast of the intersection of Hihi Road and Taemaro Road
The Contract Works include, but are not limited to, the supply of all labour, plant, materials and equipment, for the construction and completion of the following work in accordance with the specification and drawings:
a. Customer service and contract management.
b. Establishment and site preparation.
c. Temporary Traffic Management at the sites during the work.
d. The provision of all quality assurance requirements of this document.
e. Repair of the bridge structures including major reinforced concrete repairs, strengthening of the bridge elements, pile jacketing, and other works in accordance with the specification and drawings.
f. The supply of all plant, labour and materials to complete the works within the specified time in accordance with the specification and drawings.
g. The maintenance of the work as specified.

RFx Outcome

No Winner