Tender Closed
|
|
RFx ID : | 20065529 |
Tender Name : | Luggate Wastewater Connection to Project Pure |
Reference # : | C-19-009 |
Open Date : | Friday, 24 August 2018 11:00 AM (Pacific/Auckland UTC+12:00) |
Close Date : | Tuesday, 2 October 2018 4:00 PM (Pacific/Auckland UTC+13:00) |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
Katherine Durman procurement@qldc.govt.nz |
Alternate Physical Delivery Address : | QLDC 10 Gorge Road, Queenstown 9300 |
Alternate Physical Fax Number : | |
Agency Address : |
Queenstown Lakes District Council (QLDC) wishes to engage a contractor to construct rising main pipelines, a new wastewater pump station (WWPS) building, watermains and all associated works to complete the wastewater connection from Luggate to Project Pure.
The Works involve the completion of all work associated with the Luggate Wastewater Connection to Project Pure, (The Project) which includes but is not limited to:
• the supply, installation, testing and commissioning of approximately 1194m of 180 OD PE100 PN8 pipe and 35m of 200 OD PE100 PN16 directionally drilled pipe and associated works from the existing Alice Burn No. 1 WWPS to the new Main WWPS;
• the construction of a new Main WWPS including emergency storage, the building and all electrical and mechanical works;
• the supply, installation, testing and commissioning of approximately 4230m of dual 125 OD and 110 OD PE100 PN16 sewer rising mains from the new Main WWPS to an existing Project Pure gravity manhole in Stevenson Road;
• the supply, installation, testing and commissioning of approximately 150m of 250 OD PE100 PN16 water pipe and associated works from Church Road to the new Main WWPS;
• the potential (Provisional Item) supply, installation testing and commissioning of 4230m of either a 250 OD PE100 PN16 or PN12.5 watermain in the same trench as the two sewer rising mains.
No Winner Fulton Hogan