You are not logged in.

Conclusion Walkway - Stage 2

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 24736631
Tender Name : Conclusion Walkway - Stage 2
Reference # : CI00186
Open Date : Monday, 30 August 2021 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Thursday, 30 September 2021 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Parks
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 22000000 - Building and Construction Machinery and Accessories
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : GETS inbox please for Questions and Answers
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

Conclusion Walkway Stage 2 - Section 3 - Track renewal.

Section 3 - the final section of the renewal from Doncaster Terrace to the Track intersection at Warspite Avenue in Ascot Park will address poor surface, drainage and steep gradients on Conclusion Walkway a public walking track in Porirua.

Project Works Description
The project includes:
• Re-shaping 694m of existing walkway.
• Formation of 327m of new 1.4m wide walkway.
• Construction of 8m of 1.2m wide boxed steps
• Supply, cartage, placement and compaction of 95.6 cubic metres of surfacing aggregate.
• Installation of 38m length of timber edge boards.
• Supply and installation of 74m of new 1.1m high type ‘B’ barrier on existing boardwalk (including removal and disposal of the existing barrier).
• Installation of ten 225mm diameter culverts.
• Installation of 300mm diameter concrete pipe with catch pit entry and stormwater connection.
• De-commissioning of existing walkway sections that are disused.

Construction work is described in detail in the Tender drawings and specifications.

Careful thought is to be given to;
- public access and safety
- building the track in a safe and compliant way, environmental considerations
- On time and budget
- Site being left in a clean and tidy state.

RFx Outcome

No Winner Contract awarded on 29 October 2021 to Tascon 2019 Limited.