Turua School - Combined 5YA Works

Details

Tender Closed
RFx ID : 20154456
Tender Name : Turua School - Combined 5YA Works
Reference # :
Open Date : Monday, 17 September 2018 10:30 AM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 15 October 2018 4:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Auckland
  • Bay of Plenty
  • Waikato
Exemption Reason : None
Required Pre-qualifications : None
Contact : All queries to be made through the GETS website Q&A function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Agency Address : NEW ZEALAND
Overview

The Contract Works required are but not limited to;
•Total refurbishment of Toilets (Male and Female) Lifecycle replacement of floor vinyl, wall linings to be repaired and painted throughout. Hot water system to basins as per MOE requirements, partitions to be repaired and painted throughout. Ceiling to be painted in both male and female and repaired in Female toilet. Hardware to be replaced on partitions as needed. All joinery and trims to be painted. Skylight in male toilet to be replaced

•Classroom 6 Refurbishment, lifecycle replacement of carpet tiles, wall linings – autex. New suspended ceilings. Replace sliding glass pane windows. Remove decommissioned radiator pipes. Replace syklight

•Classroom 7 Refurbishment, lifecycle replacement of carpet tiles, wall linings – autex. New suspended ceilings. Remove existing sink and move to new location. Remove decommissioned radiator pipes. Replace sliding glass pane windows. Replace Heat pump. Replace skylight.

•Break Out Room between Classroom 6 and 7, new carpet tiles, wall lining, suspended ceiling. Install power points. Break out room doors are to be removed and the area to be made open plan and accessible to both classrooms.

•Classroom 8 Refurbishment, new carpet tile, wall linings – autex. New suspended ceilings. Remove shelving adjacent to existing sink Remove existing sink and move to new location. Remove decommissioned radiator pipes. Replace sliding glass pane windows

•Exterior of Block B, Replace clearlite on the exterior of the building and replace with new

RFx Outcome

No Winner Project is no longer going ahead