Main Contractor for the Roofing and Window Joinery Replacement at Sir Edmund Hillary Collegiate

Details

Tender Closed
RFx ID : 19592722
Tender Name : Main Contractor for the Roofing and Window Joinery Replacement at Sir Edmund Hillary Collegiate
Reference # :
Open Date : Friday, 6 April 2018 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date : Wednesday, 2 May 2018 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Auckland
Required Pre-qualifications : None
Contact : All communication is to come through the GETS question and answer function
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Window Joinery Replacement – Junior and Middle School Gym
• The existing high level window joinery in the Junior and Middle School Gym is to be removed and replaced with heavy duty commercial grade 40mm aluminium joinery.
• Replacements are to match the existing profile of the windows as close as possible.
• All hardware will be included and priced to match the existing units (closers, latches, locks, etc.)
• The proposed products and materials must be rated for this use and application, as well as being fit for purpose.

Roofing Works

Block H – Room 20
• The roof and all gutters/downpipes are to be replaced
• Roof are to be insulated – contractors are to inform themselves if required

Junior Block JB – Rooms 1 – 18
• All clearlite sheeting is to be replaced (including all fixings) including safety mesh as per MoE guidelines

Technology Block – Senior School
• Upper cliplok roof is to be replaced with new roofing iron
• Lower membrane roofing is to be re-pitched and fitted with new roofing iron
• Rain heads and gutters are to be replaced
• Roof are to be insulated – contractors are to inform themselves if required

Music Room – Senior School
• The existing skylights are to be removed
• The roof and all gutters/downpipes are to be replaced
• Roof are to be insulated – contractors are to inform themselves if required

Marae/Whare
• New roofing iron is to be fit on low pitch roof area, all flashings are to be replaced
• Roof are to be insulated – contractors are to inform themselves if required

Junior and Middle School Gym
• The whole roof is to be replaced including all flashings and gutters
• This work needs to be carried out in conjunction with the window joinery replacement
• Roof are to be insulated – contractors are to inform themselves if required

Middle School M3-M11
• All fibrolite sheets and fixings are to be replaced, the contractors are to recommend the best fitting solution for the area