16-2701-01 Te Wharau - Block B & O ILE and Toilet Upgrade

Details

Tender Closed
RFx ID : 18093784
Tender Name : 16-2701-01 Te Wharau - Block B & O ILE and Toilet Upgrade
Reference # : 16-2701-01 Restricted Tender
Open Date : Wednesday, 2 November 2016 4:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 24 November 2016 4:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Gisborne
  • Hawke's Bay
Exemption Reason : None
Required Pre-qualifications : None
Contact : School Support Napier
+64 6 8352922
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address : NEW ZEALAND
Overview

The Ministry of Education (the Ministry and The Board of Trustees of Te Wharau School (the Buyer) is seeking a Main Building Contractor for Block B and Block O ILE and Toilet Block Upgrade at Te Wharau School (the School).
The Project comprises of :

Phase 1: Block O ILE (Innovative Learning Environment) Upgrade which includes removing the wall between the 2 Cloakbays to make one Break out space. Relining the walls with 12mm plywood, and Autex Vertiface composition, new suspended ceiling and floor coverings. (see Plans: Sheets 22 to 26).

Phase 2: Block B Building Repurposement ILE Upgrade of the Resource Area. New roof and walls over the offices/ Resource area, and an ILE upgrade of this area to create a break out space and resource area. Cladding and lining, overlain with Autex Vertiface composition, and new suspended ceiling and floor coverings. (see Plans: Sheets 3 to 21).

Phase 3: Block B Toilet block upgrade and cloak bay area in Block B including insulation, hardiglaze over 7mm plywood wall linings, new flooring, new toilet pans and basins, new Hardiglaze ceiling lining and insulation. (see Plans - Sheets 27 to 32)

Block O ILE upgrade to create one Break out space (Phase 1) is the first priority for Construction - to be completed first. All Construction to be completed by the end of School term 1.

RFx Outcome

No Winner Shayne McNaught Builders Ltd awarded the contract