Tender Closed
|
|
RFx ID : | 22104493 |
Tender Name : | 3 Waters Earthquake Repairs (in ground assets) |
Reference # : | |
Open Date : | Saturday, 22 February 2020 8:30 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Tuesday, 24 March 2020 6:30 PM (Pacific/Auckland UTC+13:00) |
Tender Type : | Request for Quotations (RFQ) |
Tender Coverage : | Sole Agency [?] |
Categories : | |
Regions: |
|
Exemption Reason : | 14.9.i Secondary procurement |
Required Pre-qualifications : | None |
Contact : |
Hunter Stivens hunter@pdpgroup.co.nz 021317115 |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : | |
Agency Address : |
The Scope of Works for this contract package includes the repair or replacement of 3 Water assets damaged by the Kaikoura Earthquakes. These works include a range of repair or replacement strategies to address isolated earthquake related damage, generally described as:
• Drainage Assets:
o Manhole or Sump replacement;
o Manhole repairs (sealing of the interface between pipeline and manhole structure)
o Segment repairs (to remove dips or similar);
o Patch repairs (to remove cracking / joint displacement or similar);
o Lateral repairs (replacement of lateral connection to mains);
o Relay (replacement of pipeline, manhole to manhole, to remove dips or similar).
• Potable Water:
o Relay (between valves);
o Installation of power ducts in common trench.
All assets are to be renewed on existing alignments, to the grades and levels as per the pre-earthquake conditions (unless otherwise agreed with the Engineer). Typical drainage pipeline repairs will encompass a pipe short connected to the existing assets with appropriate connectors.
Participants are asked to price based on both a trenched and trenchless repair methodology for each scenario (where a trenchless solution is viable). The preferred Contractor will work through each repair with the Principal in a workshop prior to finalising the Contract Price and awarding the contract. The Participant is to allow for attendance at this workshop by the Site Engineer, Project Manager and any nominated subcontractors to finalise the scope of works.
If agreement cannot be reached between the preferred Contractor and the Principal following this workshop the Contractor will be paid the value of this item from the Schedule of Prices.
The intent of the Schedule of Prices is to, where practical, have an all-inclusive price for each repair including establishment, repair and reinstatement. We would expect that Contractors will bundle activities within close proximity to minimise costs.
No site visit during the submission period has been planned. Contractors are expected to have statisfied themselves prior to submission that they have included for the requirements of each site, including reinstatement.
This tender has been awarded.